Brace your Q3 BOM costs. A massive wave of price hikes (up to 15%) is officially hitting the market this June and July.
Buyers are facing a double-threat right now: rising costs and shrinking supply. With TE proactively squeezing Q3 automotive shipments and Molex/ST jacking up prices on critical components, the spot market is about to get highly competitive. If you aren't moving fast, these mid-year hikes will eat your margins.
TE
• Effective July 2026, pricing for automotive components will increase by an average of 6%. The new pricing will be strictly based on the actual delivery date of the goods.
• The Automotive Business Unit (BU) has already met its annual performance targets. To manage business pacing for next year, TE may proactively reduce its shipment volumes in Q3.
• As a result, Q3 spot market demand for automotive components is expected to rise sharply, which will significantly increase shortage risks across the market.
Molex
• A broad price increase ranging from 3% to 10% will be implemented in July 2026.
• High-end application products, specifically those for AI servers and high-speed backplanes, will see the highest percentage increases.
• Price adjustments for general consumer-grade materials will remain relatively low and limited.
STMicroelectronics
• Effective June 28, 2026, prices for power devices and power supply components will increase by 8% to 15%.
•The manufacturer stated that this price adjustment is necessary due to continued inflationary pressures and rising production costs.

Infineon
• Effective July 1, 2026, pricing for selected product lines will be adjusted upward.
•This decision is driven by significant cost pressures across the manufacturing supply chain, combined with a sharp rise in market demand.
DIODES
• A new round of price increases is expected soon.
• The brand has launched the new APK43070Q component, priced at $0.80 for orders starting at 1,000 pieces.
• A standard APK43070 model is also available for industrial and commercial applications.
Skyworks
• Effective June 4, 2026, price increases have been implemented on selected products.

Renesas
• Effective July 1, 2026, pricing structures will be updated across their portfolio.
• This adjustment is driven by a significant increase in raw material and production costs.

MURATA
• Prices for MLCCs and general-purpose components are increasing.
• High-end automotive and AI server MLCC prices will surge by 15% to 35%, while general-purpose items will increase by 6% to 13%.
• The manufacturer expects this current shortage wave to last until at least 2027.
Panasonic
• June price hikes: Tantalum capacitors up 15%–30%; aluminum electrolytic up 20%–30%.
• Lead times extended: Aluminum electrolytic at 14–24 weeks; standard commercial tantalum at 12–16 weeks.
• Auto-grade and polymer tantalum face critical shortages, stretching to 16–30 weeks (up to 52+ weeks for tight models).
SOURIAU-SUNBANK
• Effective July 1, 2026, prices will increase by 2% to 4%.
• Due to extended delays, the final lead time is now expected to be 5 to 7 months.
AVX
• Tantalum capacitor shipment prices were increased on June 1.
• Standard solid tantalum (TAJ/TLJ series) sees a 10%–20% spot premium and 16–20 week lead times.
• Polymer tantalum (TCJ/TPS series) is nearly out of stock, with lead times severely extended to 26–52 weeks.
TDK
• Prices up: EPCOS high-voltage resistors (>150V) increased by 25%+, and thermistors by 15%+.
• Lead times hit 16–20 weeks for high-capacitance items, filters, and film capacitors.
• Inductors, ferrite beads, and varistors now exceed 24 weeks, with some facing strict allocation.
TAIYO YUDEN
• Strict order controls are now implemented due to a massive demand surge.
• Price hikes: MLCCs increased by 10%–30%; ferrite beads by 4%–30%.
• Automotive soft termination lead times now exceed 7 months; other auto components are at 16–22 weeks.
SAMSUNG
• Overall lead times are extending due to low spot market inventory.
• High-capacitance (≥10μF), high-voltage, automotive, and AI server materials now have a 20 -26 week lead time.
• General low-capacitance items (≤1μF) remain at 12 - 16 weeks.
PHOENIX CONTACT
• Future delivery schedules are highly unstable with a significant risk of delays.
• Production capacity is severely limited due to a sudden and massive surge in incoming orders.
YAGEO
• Facing severe shortages and rising prices for high-capacitance MLCCs, thick film resistors, and auto MLCCs.
• Lead times extended: Standard items (12–16 weeks), high-cap (20–24 weeks), and auto MLCCs (22–26 weeks, fully booked).
• Expect overall lead times to universally exceed 6 months in the second half of the year.
Wolfspeed
• Revenue for Q3 of Fiscal Year 2026 reached approximately $150 million.
•The AI data center business saw significant momentum, achieving a quarter-over-quarter growth of about 30%.
TI
• The DRV8353SRTAR component is currently experiencing high market demand.
• It is specifically designed for demanding Brushless DC (BLDC) motor applications.
• Target applications include e-bikes, EVs, robotics, power and garden tools, fans, and industrial pumps.
MICROCHIP
• The brand has officially launched the new 3.3kV HV-D3 MSiC power module.
• This product is specifically designed to power solid-state transformers for AI data centers.
MAXLINEAR
•MaxLinear has partnered with Edgecore Networks to jointly develop AI edge networking solutions.
• The solutions are designed for next-generation, AI-driven workloads at the network edge.
•The technology optimizes AI/ML processing, enterprise cloud access, 5G backhaul, and intelligent security gateways.
ADI
• ADI has introduced the ADM33051E high-speed CAN transceiver alongside a new multi-phase AI power solution.
• These components are primarily targeted at industrial control, building automation, security systems, HVAC, medical equipment, and transportation electronics.
Micron
• DRAM spot market prices experienced a slight upward trend during the week of May 20 to May 26.
SILERGY
• Effective July 1, 2026, Silergy will adjust prices across various product series.
• The exact price increase percentages will vary depending on the specific product line.
CCTC
• Prices for high-capacitance components are continuing to rise.
• Buyers should expect impending price increases ranging from 10% to 30%.
CHINOCERAL
• The manufacturer's production capacity is now fully booked through June 2027, severely limiting new allocations.
FH
• The manufacturer has temporarily suspended taking new orders for both resistors and capacitors.
• Due to the suspension, available spot market inventory is currently facing a 10% to 20% price premium.
Gainsil
• Effective June 1, 2026, comprehensive price adjustments have been implemented across all product series.
AISHI
• The manufacturer has broadly reduced production for low-voltage liquid products (size 8 and below).