Sensor Accessories

Results:
Sensors Accessories are supplementary devices designed to enhance the functionality, accuracy, or usability of sensors. They play a crucial role in the operation of various sensing systems, ensuring optimal performance and data collection.

Definition:
Sensors Accessories are additional components that complement primary sensor devices. They can include mounting hardware, signal conditioners, calibration tools, and protective covers, among others. These accessories are essential for ensuring that sensors are installed correctly, operate within their specified parameters, and are protected from environmental factors that could affect their performance.

Functions:
1. Enhanced Stability: Mounting brackets and stands provide stability, reducing vibrations and ensuring accurate readings.
2. Signal Conditioning: Signal conditioners process raw sensor data, converting it into a format that is easier to analyze and interpret.
3. Calibration: Calibration tools help maintain sensor accuracy over time by allowing for regular adjustments to account for drift or wear.
4. Environmental Protection: Protective covers and enclosures shield sensors from dust, moisture, and other environmental factors that could compromise their performance.
5. Data Transmission: Cables and wireless transmitters facilitate the transfer of sensor data to processing units or systems.

Applications:
Sensors Accessories are used across various industries and applications, including:
- Industrial Automation: For precise control and in manufacturing processes.
- Environmental : To measure and record parameters like temperature, humidity, and air quality.
- Healthcare: For medical devices that require accurate and reliable sensing capabilities.
- Transportation: In vehicles for safety features like airbag deployment sensors.
- Agriculture: For soil conditions and crop health.

Selection Criteria:
When choosing sensors accessories, consider the following factors:
1. Compatibility: Ensure the accessory is compatible with the specific sensor model and the intended application.
2. Durability: Look for accessories that can withstand the environmental conditions of the deployment site.
3. Ease of Use: Some accessories may require ease of installation and operation, especially in remote or hard-to-reach locations.
4. Cost-Effectiveness: Consider the cost of the accessory in relation to the benefits it provides in terms of performance and reliability.
5. Manufacturer's Recommendations: Often, sensor manufacturers provide guidelines or recommendations for the best accessories to use with their products.

In summary, sensors accessories are indispensable for maximizing the efficiency and effectiveness of sensor-based systems. They provide the necessary support to ensure that sensors operate optimally and deliver accurate, reliable data.
Please refer to the product rule book for details.
Read More
Sensor AccessoriesResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
Pre-order
100
Factory Lead Time:10-20 weeks
1+$24.8787
10+$24.3493
- +
Ext. Price(USD):$49.75
MOQ:2
Mult:1
SPQ:1
Molex
ECAD Model:
Mounting Bracket For C23 Photoelectric Sensors
Pre-order
1,000
Factory Lead Time:22-26 weeks
10+$6.925
- +
Ext. Price(USD):$69.25
MOQ:10
Mult:10
SPQ:10
Pre-order
20,000
Factory Lead Time:9-13 weeks
1+$165.6232
4+$163.2572
10+$156.159
- +
Ext. Price(USD):$165.62
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Valve Connector, 2 POS
Pre-order
30,000
Factory Lead Time:22-26 weeks
300+$14.15
- +
Ext. Price(USD):$4,245.00
MOQ:300
Mult:300
Molex
ECAD Model:
Pre-order
900
Factory Lead Time:22-26 weeks
9+$7.6875
75+$7.525
150+$7.375
300+$7.2375
- +
Ext. Price(USD):$69.18
MOQ:9
Mult:9
SPQ:9
Molex
ECAD Model:
Brad HarshIO Digital Module for CANopen, Compact 30mm, IP67, 8 Ports M8, 8 Universal User Configurable I/Os
Pre-order
100
Factory Lead Time:22-26 weeks
1+$379.2
2+$364.025
4+$349.475
- +
Ext. Price(USD):$379.20
MOQ:1
Mult:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$79.05
- +
Ext. Price(USD):$79.05
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
1,000
Factory Lead Time:22-26 weeks
10+$7.0125
125+$6.8625
250+$6.725
500+$6.6
- +
Ext. Price(USD):$70.12
MOQ:10
Mult:10
SPQ:10
Molex
ECAD Model:
Pre-order
900
Factory Lead Time:22-26 weeks
9+$7.75
75+$7.5875
150+$7.45
300+$7.3
- +
Ext. Price(USD):$69.75
MOQ:9
Mult:9
SPQ:9
Molex
ECAD Model:
Valve Access Connector, Polyamide, Black
Pre-order
10,000
Factory Lead Time:22-26 weeks
100+$6.3625
- +
Ext. Price(USD):$636.25
MOQ:100
Mult:100
Pre-order
20,000
Factory Lead Time:9-13 weeks
1+$155.9349
4+$153.7073
10+$147.0244
- +
Ext. Price(USD):$155.93
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
DIN Connector for Valves
Pre-order
1,000
Factory Lead Time:22-26 weeks
10+$7.225
25+$7.075
50+$6.925
100+$6.8
- +
Ext. Price(USD):$72.25
MOQ:10
Mult:10
SPQ:10
Phoenix Contact Solenoid Valve Connector, 250 VAC
Pre-order
100
Factory Lead Time:10-20 weeks
1+$12.658
10+$12.3887
- +
Ext. Price(USD):$37.97
MOQ:3
Mult:1
SPQ:1
Pre-order
200
Factory Lead Time:22-26 weeks
2+$78.9125
5+$74.7
- +
Ext. Price(USD):$157.82
MOQ:2
Mult:2
SPQ:2
Phoenix Contact Sensor/Actuator Cable SAC-6P-3,0-188/FSC SH SCO
Pre-order
5,000
Factory Lead Time:10-20 weeks
50+$84.1304
500+$82.3404
- +
Ext. Price(USD):$4,206.52
MOQ:50
Mult:50
SPQ:50
Pre-order
700
Factory Lead Time:22-26 weeks
7+$10.3
- +
Ext. Price(USD):$72.10
MOQ:7
Mult:7
Phoenix Contact Sensor/Actuator Cable SAC-4P-MR/1,0-PURSHSCONLY
Pre-order
100
Factory Lead Time:10-20 weeks
1+$60.6201
10+$59.3303
- +
Ext. Price(USD):$60.62
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
1,300
Factory Lead Time:22-26 weeks
13+$5.45
125+$5.3375
250+$5.2375
500+$5.125
- +
Ext. Price(USD):$70.85
MOQ:13
Mult:13
SPQ:13
Molex
ECAD Model:
Pre-order
1,300
Factory Lead Time:22-26 weeks
13+$5.275
25+$5.1625
50+$5.0625
100+$4.95
- +
Ext. Price(USD):$68.57
MOQ:13
Mult:13
SPQ:13
Phoenix Contact Sensor/Actuator Cable, SAC-4P-MS/5,0-170/FSSCOVL
Pre-order
2,500
Factory Lead Time:10-20 weeks
25+$58.6133
250+$57.3662
- +
Ext. Price(USD):$1,465.33
MOQ:25
Mult:25
SPQ:25
Pre-order
200
Factory Lead Time:22-26 weeks
2+$108.5
5+$102.7125
- +
Ext. Price(USD):$217.00
MOQ:2
Mult:2
SPQ:2
Phoenix Contact Programmable Logic Development Kit
Pre-order
100
Factory Lead Time:10-20 weeks
1+$180.8129
10+$176.9658
- +
Ext. Price(USD):$180.81
MOQ:1
Mult:1
SPQ:1
Pre-order
200
Factory Lead Time:22-26 weeks
2+$177.55
5+$168.075
- +
Ext. Price(USD):$355.10
MOQ:2
Mult:2
SPQ:2
Molex
ECAD Model:
Pre-order
1,000
Factory Lead Time:22-26 weeks
10+$6.975
75+$6.825
150+$6.6875
300+$6.5625
- +
Ext. Price(USD):$69.75
MOQ:10
Mult:10
SPQ:10
Pre-order
10
Factory Lead Time:7-9 weeks
1+$32.6724
- +
Ext. Price(USD):$32.67
MOQ:1
Mult:1
SPQ:1
25 / PageGoto