Sensor Accessories

Results:
Sensors Accessories are supplementary devices designed to enhance the functionality, accuracy, or usability of sensors. They play a crucial role in the operation of various sensing systems, ensuring optimal performance and data collection.

Definition:
Sensors Accessories are additional components that complement primary sensor devices. They can include mounting hardware, signal conditioners, calibration tools, and protective covers, among others. These accessories are essential for ensuring that sensors are installed correctly, operate within their specified parameters, and are protected from environmental factors that could affect their performance.

Functions:
1. Enhanced Stability: Mounting brackets and stands provide stability, reducing vibrations and ensuring accurate readings.
2. Signal Conditioning: Signal conditioners process raw sensor data, converting it into a format that is easier to analyze and interpret.
3. Calibration: Calibration tools help maintain sensor accuracy over time by allowing for regular adjustments to account for drift or wear.
4. Environmental Protection: Protective covers and enclosures shield sensors from dust, moisture, and other environmental factors that could compromise their performance.
5. Data Transmission: Cables and wireless transmitters facilitate the transfer of sensor data to processing units or systems.

Applications:
Sensors Accessories are used across various industries and applications, including:
- Industrial Automation: For precise control and in manufacturing processes.
- Environmental : To measure and record parameters like temperature, humidity, and air quality.
- Healthcare: For medical devices that require accurate and reliable sensing capabilities.
- Transportation: In vehicles for safety features like airbag deployment sensors.
- Agriculture: For soil conditions and crop health.

Selection Criteria:
When choosing sensors accessories, consider the following factors:
1. Compatibility: Ensure the accessory is compatible with the specific sensor model and the intended application.
2. Durability: Look for accessories that can withstand the environmental conditions of the deployment site.
3. Ease of Use: Some accessories may require ease of installation and operation, especially in remote or hard-to-reach locations.
4. Cost-Effectiveness: Consider the cost of the accessory in relation to the benefits it provides in terms of performance and reliability.
5. Manufacturer's Recommendations: Often, sensor manufacturers provide guidelines or recommendations for the best accessories to use with their products.

In summary, sensors accessories are indispensable for maximizing the efficiency and effectiveness of sensor-based systems. They provide the necessary support to ensure that sensors operate optimally and deliver accurate, reliable data.
Please refer to the product rule book for details.
Read More
Sensor AccessoriesResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
Pre-order
20,000
Factory Lead Time:9-13 weeks
1+$379.8139
4+$374.388
10+$358.1102
- +
Ext. Price(USD):$379.81
MOQ:1
Mult:1
SPQ:1
Cable Assembly Assembled Circular 9m 22AWG/24AWG M12 Circular 10 POS F
Pre-order
100
Factory Lead Time:22-26 weeks
1+$379.625
3+$359.3625
- +
Ext. Price(USD):$379.62
MOQ:1
Mult:1
SPQ:1
Pre-order
10,000
Factory Lead Time:4-5 weeks
10+$157.8965
20+$153.8821
- +
Ext. Price(USD):$1,578.96
MOQ:10
Mult:10
Pre-order
400
Factory Lead Time:22-26 weeks
4+$81.7
- +
Ext. Price(USD):$326.80
MOQ:4
Mult:4
Pepperl+Fuchs
ECAD Model:
Pre-order
10
Factory Lead Time:7-9 weeks
1+$72.7186
- +
Ext. Price(USD):$72.71
MOQ:1
Mult:1
SPQ:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$91.925
- +
Ext. Price(USD):$91.92
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Sensata Cynergy3 Extension Tube, For Vertical Plastic Switch
Pre-order
100
Factory Lead Time:22-26 weeks
1+$142.6875
- +
Ext. Price(USD):$142.68
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Aero-Motive Slip Ring Component Kit, 30A, 12 AWG, 4 Conductors, Bore Size 22.23mm (.875") Diameter
Pre-order
100
Factory Lead Time:22-26 weeks
1+$365.2125
2+$350.6
4+$336.575
- +
Ext. Price(USD):$365.21
MOQ:1
Mult:1
SPQ:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$584.3375
- +
Ext. Price(USD):$584.33
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Reflector for Photoelectric Sensors, 100 x 100mm, Self-adhesive, Standard Foil Type
Pre-order
900
Factory Lead Time:22-26 weeks
9+$8.1
10+$7.9375
- +
Ext. Price(USD):$72.90
MOQ:9
Mult:9
SPQ:9
Pre-order
500
Factory Lead Time:22-26 weeks
5+$87.4125
20+$82.75
- +
Ext. Price(USD):$437.06
MOQ:5
Mult:5
SPQ:5
Pre-order
10
Factory Lead Time:7-9 weeks
1+$20.5119
- +
Ext. Price(USD):$20.51
MOQ:1
Mult:1
SPQ:1
Pre-order
300
Factory Lead Time:22-26 weeks
3+$53.5625
- +
Ext. Price(USD):$160.68
MOQ:3
Mult:3
Molex
ECAD Model:
Pre-order
800
Factory Lead Time:22-26 weeks
8+$8.4625
10+$8.3
- +
Ext. Price(USD):$67.70
MOQ:8
Mult:8
SPQ:8
Local Bus Device, 4 Analog Inputs, 3 Current & 4 Voltage Ranges, 500kbaud/2Mbaud Selection
Pre-order
100
Factory Lead Time:16-30 weeks
1+$4,846.4003
- +
Ext. Price(USD):$4,846.40
MOQ:1
Mult:1
SPQ:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$680.1625
- +
Ext. Price(USD):$680.16
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$219.15
2+$214.775
3+$210.475
5+$206.2625
- +
Ext. Price(USD):$219.15
MOQ:1
Mult:1
SPQ:1
Pre-order
200
Factory Lead Time:22-26 weeks
2+$40.3625
- +
Ext. Price(USD):$80.72
MOQ:2
Mult:2
SPQ:2
Pre-order
100
Factory Lead Time:22-26 weeks
1+$1,180.7375
2+$1,117.775
- +
Ext. Price(USD):$1,180.73
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
600
Factory Lead Time:22-26 weeks
6+$11.125
25+$10.9
50+$10.6875
100+$10.475
- +
Ext. Price(USD):$66.75
MOQ:6
Mult:6
SPQ:6
Molex
ECAD Model:
Valve Access Connector, Polyamide, Black
Pre-order
1,000,000
Factory Lead Time:17 weeks
10,000+$2.2145
20,000+$2.1776
- +
Ext. Price(USD):$22,145.00
MOQ:10,000
Mult:10,000
SPQ:10,000
Mounting, Adapters Tether Arm Kit for Hollow Shaft
Pre-order
100
Factory Lead Time:22-26 weeks
1+$75.0125
- +
Ext. Price(USD):$75.01
MOQ:1
Mult:1
SPQ:1
Pepperl+Fuchs
ECAD Model:
Pre-order
10
Factory Lead Time:7-9 weeks
1+$20.7456
- +
Ext. Price(USD):$20.74
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Coaxial Cable Assembly, 10m, 4 POS, IP67, M12 Circular Receptacle
Pre-order
100
Factory Lead Time:22-26 weeks
1+$67.9875
- +
Ext. Price(USD):$67.98
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
400
Factory Lead Time:22-26 weeks
4+$43.2875
- +
Ext. Price(USD):$173.15
MOQ:4
Mult:4
25 / PageGoto