Other Sensors

Results:
Definition:
Other Sensors, as a category, encompasses a wide array of devices that detect and measure physical properties and phenomena beyond the conventional types such as temperature, pressure, and light. These specialized sensors are designed to respond to specific stimuli and convert them into electrical signals for further processing and analysis.

Function:
The function of other sensors is to provide accurate and real-time data about their respective environments or systems. They can detect changes in various parameters like chemical composition, biological activity, motion, or even human presence. These sensors are integral for and controlling processes in industries, research, and everyday applications.

Applications:
1. Industrial Automation: Used for quality control, safety, and efficiency in manufacturing processes.
2. Environmental : To measure air and water quality, detect pollutants, and monitor climate changes.
3. Healthcare: For diagnostics, patient , and medical device functionality.
4. Security Systems: To detect intrusion, monitor access points, and ensure safety.
5. Consumer Electronics: In smartphones, smartwatches, and home automation systems for user interaction and data collection.
6. Agriculture: For soil analysis, crop , and precision farming.
7. Research and Development: In laboratories for scientific experiments and data collection.

Selection Criteria:
1. Sensitivity: The ability to detect small changes in the parameter being measured.
2. Accuracy: How closely the sensor's output matches the true value.
3. Resolution: The smallest change in the measured parameter that the sensor can detect.
4. Response Time: The speed at which the sensor reacts to changes in the environment.
5. Reliability: The consistency and dependability of the sensor's performance over time.
6. Environmental Factors: The sensor's ability to operate in various conditions such as temperature, humidity, and pressure.
7. Integration: How easily the sensor can be integrated with existing systems or devices.
8. Cost: The balance between the sensor's performance and its price, considering the application's budget.
9. Power Consumption: Important for battery-operated or energy-sensitive applications.
10. Size and Form Factor: Depending on the space constraints and design requirements of the application.

When selecting other sensors, it's crucial to consider the specific requirements of the application and match them with the sensor's capabilities to ensure optimal performance and data accuracy.
Please refer to the product rule book for details.
Read More
Other SensorsResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
Molex
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$147.3625
3+$144.425
5+$141.5375
10+$138.7
- +
Ext. Price(USD):$147.36
MOQ:1
Mult:1
SPQ:1
Sensata / Cynergy3 Stainless Steel Float Switch, SSV66-SM16 Series, Vertical Mount, Max +120°C, NO/NC
Pre-order
100
Factory Lead Time:22-26 weeks
1+$308.1375
- +
Ext. Price(USD):$308.13
MOQ:1
Mult:1
SPQ:1
Pre-order
200
Factory Lead Time:22-26 weeks
2+$34.4625
5+$32.625
- +
Ext. Price(USD):$68.92
MOQ:2
Mult:2
SPQ:2
Pre-order
10
Factory Lead Time:8-10 weeks
1+$598.4618
- +
Ext. Price(USD):$598.46
MOQ:1
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$132.6375
3+$129.9875
5+$127.3875
10+$124.8375
- +
Ext. Price(USD):$132.63
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$477.075
- +
Ext. Price(USD):$477.07
MOQ:1
Mult:1
Pre-order
10
Factory Lead Time:8-10 weeks
1+$330.1766
- +
Ext. Price(USD):$330.17
MOQ:1
Mult:1
SPQ:1
Cynergy3
Package:SPDT
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$89.5125
- +
Ext. Price(USD):$89.51
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$142.75
- +
Ext. Price(USD):$142.75
MOQ:1
Mult:1
SPQ:1
Sensata/Cynergy 3 Pressure Level Transmitter, ILSE Series, 4-20mA Out, Max 20bar
Pre-order
100
Factory Lead Time:22-26 weeks
1+$307.6625
- +
Ext. Price(USD):$307.66
MOQ:1
Mult:1
SPQ:1
Pre-order
200
Factory Lead Time:22-26 weeks
2+$41
5+$38.8125
- +
Ext. Price(USD):$82.00
MOQ:2
Mult:2
SPQ:2
Pre-order
100
Factory Lead Time:22-26 weeks
1+$307.6625
- +
Ext. Price(USD):$307.66
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Sensata / Cynergy3 PVDF Float Switch, RSF80 Series, Horizontal Mount, Max +105°C, NO/NC
Pre-order
200
Factory Lead Time:22-26 weeks
2+$66.675
5+$63.1125
- +
Ext. Price(USD):$133.35
MOQ:2
Mult:2
SPQ:2
Cynergy3
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$34.7375
5+$32.8875
- +
Ext. Price(USD):$69.47
MOQ:2
Mult:2
SPQ:2
Sensata/Cynergy 3 Pressure Level Transmitter, ILSE Series, 0.5-4.5V Out, Max 20bar
Pre-order
100
Factory Lead Time:22-26 weeks
1+$307.6625
- +
Ext. Price(USD):$307.66
MOQ:1
Mult:1
SPQ:1
Pre-order
10
Factory Lead Time:8-10 weeks
1+$598.4618
- +
Ext. Price(USD):$598.46
MOQ:1
Mult:1
SPQ:1
TE Connectivity
Package:SIP-4
ECAD Model:
KMY/KMZ High Sensitivity, No Hysteresis: Magnetic Field Measurement, Rotation Counter, Proximity Detection, Position Measurement
Pre-order
100,000
Factory Lead Time:22-26 weeks
1,000+$3.2375
3,000+$3.0625
5,000+$2.775
10,000+$2.6
- +
Ext. Price(USD):$3,237.50
MOQ:1,000
Mult:1,000
SPQ:1,000
Level Sensor 30V 4-Pin
Pre-order
100
Factory Lead Time:22-26 weeks
1+$1,424.525
- +
Ext. Price(USD):$1,424.52
MOQ:1
Mult:1
SPQ:1
Sensata Cynergy3 Pressure Level Transmitter, ILTS Series, Max 50bar
Pre-order
100
Factory Lead Time:22-26 weeks
1+$1,050.9875
- +
Ext. Price(USD):$1,050.98
MOQ:1
Mult:1
SPQ:1
Pre-order
10
Factory Lead Time:8-10 weeks
1+$345.8488
- +
Ext. Price(USD):$345.84
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Sensata / Cynergy 3 HDPE Float Switch, LM Series, Wire Mount, +55°C Max, NC
Pre-order
100
Factory Lead Time:22-26 weeks
1+$227.0375
- +
Ext. Price(USD):$227.03
MOQ:1
Mult:1
Pre-order
100
Factory Lead Time:16-30 weeks
1+$4,321.0518
- +
Ext. Price(USD):$4,321.05
MOQ:1
Mult:1
SPQ:1
Sensata / Cynergy3 Stainless Steel Float Switch, SSV66-SM16 Series, Vertical Mount, Max +120°C, NO/NC
Pre-order
100
Factory Lead Time:22-26 weeks
1+$308.1375
- +
Ext. Price(USD):$308.13
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$39.1375
5+$37.0625
- +
Ext. Price(USD):$78.27
MOQ:2
Mult:2
SPQ:2
Pre-order
100
Factory Lead Time:22-26 weeks
1+$286.05
- +
Ext. Price(USD):$286.05
MOQ:1
Mult:1
25 / PageGoto