Other Sensors

Results:
Definition:
Other Sensors, as a category, encompasses a wide array of devices that detect and measure physical properties and phenomena beyond the conventional types such as temperature, pressure, and light. These specialized sensors are designed to respond to specific stimuli and convert them into electrical signals for further processing and analysis.

Function:
The function of other sensors is to provide accurate and real-time data about their respective environments or systems. They can detect changes in various parameters like chemical composition, biological activity, motion, or even human presence. These sensors are integral for and controlling processes in industries, research, and everyday applications.

Applications:
1. Industrial Automation: Used for quality control, safety, and efficiency in manufacturing processes.
2. Environmental : To measure air and water quality, detect pollutants, and monitor climate changes.
3. Healthcare: For diagnostics, patient , and medical device functionality.
4. Security Systems: To detect intrusion, monitor access points, and ensure safety.
5. Consumer Electronics: In smartphones, smartwatches, and home automation systems for user interaction and data collection.
6. Agriculture: For soil analysis, crop , and precision farming.
7. Research and Development: In laboratories for scientific experiments and data collection.

Selection Criteria:
1. Sensitivity: The ability to detect small changes in the parameter being measured.
2. Accuracy: How closely the sensor's output matches the true value.
3. Resolution: The smallest change in the measured parameter that the sensor can detect.
4. Response Time: The speed at which the sensor reacts to changes in the environment.
5. Reliability: The consistency and dependability of the sensor's performance over time.
6. Environmental Factors: The sensor's ability to operate in various conditions such as temperature, humidity, and pressure.
7. Integration: How easily the sensor can be integrated with existing systems or devices.
8. Cost: The balance between the sensor's performance and its price, considering the application's budget.
9. Power Consumption: Important for battery-operated or energy-sensitive applications.
10. Size and Form Factor: Depending on the space constraints and design requirements of the application.

When selecting other sensors, it's crucial to consider the specific requirements of the application and match them with the sensor's capabilities to ensure optimal performance and data accuracy.
Please refer to the product rule book for details.
Read More
Other SensorsResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
Pre-order
100
Factory Lead Time:22-26 weeks
1+$191.175
- +
Ext. Price(USD):$191.17
MOQ:1
Mult:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$892.875
- +
Ext. Price(USD):$892.87
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$843.7625
- +
Ext. Price(USD):$843.76
MOQ:1
Mult:1
RTD Thermistor
Pre-order
100
Factory Lead Time:22-26 weeks
1+$119.475
5+$81.2375
10+$77.6625
50+$74.075
100+$71.675
- +
Ext. Price(USD):$119.47
MOQ:1
Mult:1
Pre-order
1,000
Factory Lead Time:22-26 weeks
10+$120.2625
- +
Ext. Price(USD):$1,202.62
MOQ:10
Mult:10
Pre-order
100
Factory Lead Time:22-26 weeks
1+$1,066.6375
5+$1,013.3
10+$949.3125
25+$853.3125
- +
Ext. Price(USD):$1,066.63
MOQ:1
Mult:1
Pre-order
100
Factory Lead Time:22-26 weeks
1+$297.0625
- +
Ext. Price(USD):$297.06
MOQ:1
Mult:1
Phoenix Contact Passive Module UM45-FLK14/8IM/ZFKDS/PLC
Pre-order
100
Factory Lead Time:10-20 weeks
1+$187.5105
10+$183.5209
- +
Ext. Price(USD):$187.51
MOQ:1
Mult:1
SPQ:1
Cynergy3
Package:SPDT
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$54.3
- +
Ext. Price(USD):$108.60
MOQ:2
Mult:2
SPQ:2
Cynergy3
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$71.5375
5+$67.725
- +
Ext. Price(USD):$143.07
MOQ:2
Mult:2
SPQ:2
Pre-order
100
Factory Lead Time:22-26 weeks
1+$449.525
- +
Ext. Price(USD):$449.52
MOQ:1
Mult:1
SPQ:1
Sensata / Cynergy3 Stainless Steel Float Switch, SSF67PM12 Series, Vertical Mount, +135°C Max, 2 NC
Pre-order
100
Factory Lead Time:22-26 weeks
1+$316.5
- +
Ext. Price(USD):$316.50
MOQ:1
Mult:1
SPQ:1
Pre-order
100
Factory Lead Time:16-30 weeks
1+$4,321.0518
- +
Ext. Price(USD):$4,321.05
MOQ:1
Mult:1
SPQ:1
Telemecanique Sensors Photoelectric Sensor, NPN Output, 120mm~15m
Pre-order
100
Factory Lead Time:4-6 weeks
1+$93.5204
3+$91.9618
6+$90.4031
- +
Ext. Price(USD):$93.52
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
300
Factory Lead Time:22-26 weeks
3+$29.8125
5+$28.225
- +
Ext. Price(USD):$89.43
MOQ:3
Mult:3
SPQ:3
Sensata/Cynergy Pressure Level Transmitter, ILSE Series, 4-20mA Out, Max 50bar
Pre-order
100
Factory Lead Time:22-26 weeks
1+$307.6625
- +
Ext. Price(USD):$307.66
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Sensata/Cynergy3 LLF70 Series Nylon Float Switch, Horizontal External Mount, +75°C Max, SPST-NO
Pre-order
200
Factory Lead Time:22-26 weeks
2+$36.0625
5+$34.1375
- +
Ext. Price(USD):$72.12
MOQ:2
Mult:2
SPQ:2
Axioline0E Digital I/O, PROFINET, M12 Fast Conn, 16 DI (24V DC, 4-wire), 16 DO (24V DC, 500mA, 3-wire), Metal Housing, IP65/67
Pre-order
100
Factory Lead Time:16-30 weeks
1+$4,472.055
- +
Ext. Price(USD):$4,472.05
MOQ:1
Mult:1
SPQ:1
Pre-order
100
Factory Lead Time:4-6 weeks
1+$223.7715
3+$220.042
6+$216.3125
- +
Ext. Price(USD):$223.77
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Pre-order
300
Factory Lead Time:22-26 weeks
3+$31.6125
5+$29.9375
- +
Ext. Price(USD):$94.83
MOQ:3
Mult:3
SPQ:3
Cynergy3
ECAD Model:
Pre-order
300
Factory Lead Time:22-26 weeks
3+$30.95
5+$29.3
- +
Ext. Price(USD):$92.85
MOQ:3
Mult:3
SPQ:3
Cynergy3
ECAD Model:
Pre-order
300
Factory Lead Time:22-26 weeks
3+$32.5375
5+$30.8125
- +
Ext. Price(USD):$97.61
MOQ:3
Mult:3
SPQ:3
Pre-order
10
Factory Lead Time:8-10 weeks
1+$345.8488
- +
Ext. Price(USD):$345.84
MOQ:1
Mult:1
SPQ:1
Cynergy3
ECAD Model:
Level Sensor, 120V, 10bar
Pre-order
100
Factory Lead Time:22-26 weeks
1+$694.35
- +
Ext. Price(USD):$694.35
MOQ:1
Mult:1
Pre-order
10
Factory Lead Time:8-10 weeks
1+$345.8488
- +
Ext. Price(USD):$345.84
MOQ:1
Mult:1
SPQ:1
25 / PageGoto