Cable Accessories

Results:
Other Cables and Cable Assemblies

Definition:
Other cables and cable assemblies refer to a diverse range of electrical and data transmission lines that are not classified as standard power or Ethernet cables. These specialized cables are designed to meet specific requirements in various industries and applications.

Function:
1. Data Transmission: They facilitate the transfer of data between devices, often at high speeds and with minimal signal loss.
2. Power Delivery: Some cables are designed to carry power to devices that require non-standard voltages or currents.
3. Signal Integrity: They maintain the integrity of signals over long distances, which is crucial for high-fidelity audio and video applications.
4. Compatibility: They ensure compatibility with a wide range of devices and systems, including those in industrial, medical, and telecommunications sectors.

Applications:
1. Industrial Automation: Used for control and communication in robotic systems and automated machinery.
2. Medical Equipment: Employed in devices that require precise and reliable data and power connections.
3. Telecommunications: Essential for the transmission of voice, video, and data signals in telecommunications infrastructure.
4. : Used in for critical control and systems.
5. Automotive: Found in modern vehicles for data communication between various electronic control units (ECUs).

Selection Criteria:
1. Compatibility: Ensure the cable is compatible with the devices it will connect.
2. Conductivity: Choose cables with the appropriate conductivity for the power or data transfer requirements.
3. Durability: Consider the cable's resistance to environmental factors such as temperature, moisture, and abrasion.
4. Flexibility: Some applications require cables that can be flexed repeatedly without damage.
5. Safety Standards: Verify that the cable meets relevant safety and regulatory standards for the intended application.
6. Cost-Effectiveness: Balance the cost of the cable with its performance and longevity to ensure a good value for money.

When selecting other cables and cable assemblies, it's important to consider the specific needs of the application and to consult with manufacturers or suppliers for guidance on the most suitable options.
Please refer to the product rule book for details.
Read More
Cable AccessoriesResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
Molex
ECAD Model:
MC 5P MP 6 90D 16/5 PVC SS
Pre-order
200
Factory Lead Time:22-26 weeks
2+$54.75
4+$53.65
- +
Ext. Price(USD):$109.50
MOQ:2
Mult:2
SPQ:2
Pre-order
1,000
Factory Lead Time:10-20 weeks
10+$3.086
100+$3.0204
- +
Ext. Price(USD):$30.86
MOQ:10
Mult:10
SPQ:10
Z-Type Markers
Pre-order
1,000,000
Factory Lead Time:22-26 weeks
10,000+$0.0208
- +
Ext. Price(USD):$208.00
MOQ:10,000
Mult:10,000
SPQ:10,000
Pre-order
1,000,000
Factory Lead Time:22-26 weeks
10,000+$0.016
- +
Ext. Price(USD):$160.00
MOQ:10,000
Mult:10,000
SPQ:10,000
Pre-order
600,000
Factory Lead Time:22-26 weeks
6,000+$0.0363
15,000+$0.0313
30,000+$0.0288
60,000+$0.0263
- +
Ext. Price(USD):$217.80
MOQ:6,000
Mult:6,000
Molex
ECAD Model:
Cable Assembly UL 2661 4.6m 22AWG M12 Circular 3 POS F Micro-Change®
Pre-order
1,200
Factory Lead Time:22-26 weeks
12+$53.9125
- +
Ext. Price(USD):$646.95
MOQ:12
Mult:12
M12 A-Coded Receptacle, Right Angle, Single-Ended, 2-8 Pin, PUR/PVC Shielded/Unshielded Cable, Max 10m
Pre-order
2,500
Factory Lead Time:22-26 weeks
25+$20.6125
100+$19.7
2,500+$16.95
5,000+$16.05
- +
Ext. Price(USD):$515.31
MOQ:25
Mult:25
Pre-order
1,590,000
Factory Lead Time:22-26 weeks
15,900+$0.0313
30,000+$0.0288
60,000+$0.0263
- +
Ext. Price(USD):$497.67
MOQ:15,900
Mult:15,900
Pre-order
1,200,000
Factory Lead Time:22-26 weeks
12,000+$0.055
15,000+$0.0475
30,000+$0.0438
60,000+$0.04
- +
Ext. Price(USD):$660.00
MOQ:12,000
Mult:12,000
Pre-order
1,000,000
Factory Lead Time:22-26 weeks
10,000+$0.0156
- +
Ext. Price(USD):$156.00
MOQ:10,000
Mult:10,000
Molex
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$45.875
4+$44.9625
- +
Ext. Price(USD):$91.75
MOQ:2
Mult:2
SPQ:2
Molex
ECAD Model:
Cable Assembly UL 2661 3m 22AWG M12 Circular to M12 Circular 4 Pos F-M Micro-Change®
Pre-order
100
Factory Lead Time:22-26 weeks
1+$72.1875
3+$70.7375
6+$69.325
12+$67.9375
- +
Ext. Price(USD):$72.18
MOQ:1
Mult:1
SPQ:1
Pre-order
5,000
Factory Lead Time:22-26 weeks
50+$89.275
500+$66.5625
25,000+$34.0875
50,000+$32.475
- +
Ext. Price(USD):$4,463.75
MOQ:50
Mult:50
Pre-order
1,000,000
Factory Lead Time:25-42 weeks
10,000+$2.8396
- +
Ext. Price(USD):$28,396.00
MOQ:10,000
Mult:1
SPQ:1
Molex
ECAD Model:
Pre-order
200
Factory Lead Time:22-26 weeks
2+$53.925
4+$52.85
- +
Ext. Price(USD):$107.85
MOQ:2
Mult:2
SPQ:2
Molex
ECAD Model:
Pre-order
25,000
Factory Lead Time:22-26 weeks
250+$13.3375
800+$11.6875
2,000+$11.4375
- +
Ext. Price(USD):$3,334.37
MOQ:250
Mult:250
Pre-order
110,000
Factory Lead Time:22-26 weeks
1,100+$0.975
2,200+$0.875
7,500+$0.7875
15,000+$0.7375
30,000+$0.6875
- +
Ext. Price(USD):$1,072.50
MOQ:1,100
Mult:1,100
SPQ:1,100
Pre-order
300
Factory Lead Time:22-26 weeks
3+$758.7375
6+$718.275
25+$647.725
50+$583.6
- +
Ext. Price(USD):$2,276.21
MOQ:3
Mult:3
SPQ:3
Z-Type Markers
Pre-order
300,000
Factory Lead Time:22-26 weeks
3,000+$0.0224
10,000+$0.0166
- +
Ext. Price(USD):$67.20
MOQ:3,000
Mult:3,000
SPQ:3,000
Pre-order
25,000
Factory Lead Time:22-26 weeks
250+$7.775
500+$7.3625
1,000+$4.9375
2,500+$4.075
5,000+$3.35
- +
Ext. Price(USD):$1,943.75
MOQ:250
Mult:250
SPQ:250
Pre-order
150,000
Factory Lead Time:22-26 weeks
1,500+$1.5375
3,000+$1.4625
5,000+$1.1
10,000+$0.8875
25,000+$0.675
- +
Ext. Price(USD):$2,306.25
MOQ:1,500
Mult:1,500
SPQ:1,500
Molex
ECAD Model:
Pre-order
100
Factory Lead Time:22-26 weeks
1+$140.6375
3+$137.825
5+$135.075
10+$132.3625
- +
Ext. Price(USD):$140.63
MOQ:1
Mult:1
SPQ:1
Printable Heat Shrink Cable Markers
Pre-order
300,000
Factory Lead Time:22-26 weeks
3,000+$1.35
5,000+$1.025
10,000+$0.825
25,000+$0.625
100,000+$0.525
- +
Ext. Price(USD):$4,050.00
MOQ:3,000
Mult:3,000
Pre-order
400,000
Factory Lead Time:22-26 weeks
4,000+$0.0219
5,000+$0.0183
10,000+$0.0155
- +
Ext. Price(USD):$87.60
MOQ:4,000
Mult:4,000
SPQ:4,000
Molex
ECAD Model:
Pre-order
400
Factory Lead Time:22-26 weeks
4+$71.475
- +
Ext. Price(USD):$285.90
MOQ:4
Mult:4
25 / PageGoto