Current Sensors

Results:
Current sensors are devices that measure the flow of electric current in a circuit. They are essential for , controlling, and protecting electrical systems.

Definition:
A current sensor is an electronic component that detects and converts the magnitude of electrical current into a form that can be easily measured, typically a voltage or a current proportional to the current being sensed.

Functions:
1. Measurement: They provide accurate readings of current flow for purposes.
2. Control: They can be used in feedback loops to control the operation of devices based on current levels.
3. Protection: They help in circuit protection by triggering safety mechanisms when current exceeds safe limits.

Applications:
1. Automotive Systems: For battery current, motor control, and charging systems.
2. Industrial Automation: To control and monitor the operation of motors and other electrical equipment.
3. Power Electronics: In power supplies and converters to manage and regulate current flow.
4. Smart Grids: For real-time and management of power distribution.
5. Research and Development: In laboratories for testing and analyzing electrical circuits.

Selection Criteria:
1. Accuracy: The sensor should provide precise measurements within the specified range.
2. Sensitivity: The ability to detect small changes in current is crucial for some applications.
3. Response Time: Fast response is necessary for real-time and control.
4. Linearity: The sensor's output should be linearly proportional to the current being measured.
5. Temperature Range: The sensor should operate effectively within the expected temperature range of the application.
6. Isolation: For safety, many applications require electrical isolation between the primary and secondary circuits.
7. Size and Form Factor: The physical dimensions should fit the space constraints of the application.
8. Cost: The sensor should be cost-effective for the intended application.

When selecting a current sensor, it's important to consider the specific requirements of the application, including the current range, the type of output (analog or digital), and any environmental factors that may affect performance.
Please refer to the product rule book for details.
Read More
Current SensorsResults:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$70.8229
10+$57.946
200+$41.9474
500+$38.6307
- +
Ext. Price(USD):$354.11
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$38.8258
10+$31.6069
200+$22.8272
500+$21.0713
- +
Ext. Price(USD):$194.12
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$553.7062
10+$526.9769
200+$464.5435
500+$437.8142
- +
Ext. Price(USD):$2,768.53
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$44.2887
10+$36.0943
200+$26.144
500+$24.1929
- +
Ext. Price(USD):$221.44
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$263.1958
10+$250.514
200+$220.8582
500+$208.1764
- +
Ext. Price(USD):$1,315.97
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$256.5623
10+$244.2707
200+$215.3952
500+$202.9086
- +
Ext. Price(USD):$1,282.81
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$15.4132
10+$12.6818
200+$9.1699
500+$8.3895
- +
Ext. Price(USD):$77.06
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$2,876.8141
10+$2,737.8998
200+$2,413.8314
500+$2,274.9171
- +
Ext. Price(USD):$14,384.07
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$278.8042
10+$265.342
200+$233.9302
500+$220.468
- +
Ext. Price(USD):$1,394.02
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$200.9575
10+$191.2023
200+$168.5702
500+$158.815
- +
Ext. Price(USD):$1,004.78
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$3,284.3871
10+$3,125.7673
200+$2,755.8494
500+$2,597.2295
- +
Ext. Price(USD):$16,421.93
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$34.1433
10+$27.8999
200+$20.0958
500+$18.5349
- +
Ext. Price(USD):$170.71
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$5,688.8535
10+$5,414.3417
200+$4,773.4238
500+$4,498.7168
- +
Ext. Price(USD):$28,444.26
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$318.0201
10+$302.6069
200+$266.7077
500+$251.4895
- +
Ext. Price(USD):$1,590.10
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$903.3633
10+$859.78
200+$758.0856
500+$714.3372
- +
Ext. Price(USD):$4,516.81
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$321.3369
10+$305.7286
200+$269.6343
500+$254.0259
- +
Ext. Price(USD):$1,606.68
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$34.1433
10+$27.8999
200+$20.0958
500+$18.5349
- +
Ext. Price(USD):$170.71
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$8.1944
10+$6.0482
200+$4.4874
500+$3.707
- +
Ext. Price(USD):$40.97
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$264.1713
10+$251.4895
200+$221.8337
500+$208.9568
- +
Ext. Price(USD):$1,320.85
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$1,197.9409
10+$1,140.19
200+$1,005.1778
500+$947.4269
- +
Ext. Price(USD):$5,989.70
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$755.054
10+$713.1065
200+$587.2642
500+$545.3167
- +
Ext. Price(USD):$3,775.27
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$4,331.7075
10+$4,122.5556
200+$3,634.5995
500+$3,425.4476
- +
Ext. Price(USD):$21,658.53
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$9.1699
10+$6.8287
200+$5.0727
500+$4.0972
- +
Ext. Price(USD):$45.84
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$65.5401
10+$53.6537
200+$38.6307
500+$35.6591
- +
Ext. Price(USD):$327.70
MOQ:5
Mult:1
SPQ:1
LEM
ECAD Model:
Pre-order
2,000
Factory Lead Time:6-8 weeks
5+$755.2491
10+$713.3016
200+$587.4593
500+$545.5118
- +
Ext. Price(USD):$3,776.24
MOQ:5
Mult:1
SPQ:1
25 / PageGoto