Bipolar Transistors (BJT)

Results:
BJT stands for Bipolar Junction Transistor, a crucial component in electronic circuits. Here's a concise introduction in English:

Definition:
A Bipolar Junction Transistor (BJT) is a semiconductor device used to amplify or switch electronic signals and electrical power. It is composed of three layers of semiconductor material: an emitter, a base, and a collector. The emitter and collector are doped differently to create a PNP (positive-negative-positive) or NPN (negative-positive-negative) configuration.

Function:
BJTs function by allowing a small current to control a larger current flow. They operate in one of three modes: active, saturation, or cutoff. In the active mode, the base-emitter junction is forward-biased, and the base-collector junction is reverse-biased, allowing current to flow from emitter to collector. In saturation, both junctions are forward-biased, and the transistor acts as a closed switch. In cutoff, both junctions are reverse-biased, and no current flows.

Applications:
BJTs are used in a wide range of applications, including:
1. Amplifiers: They amplify weak signals in audio systems, radio receivers, and other electronic devices.
2. Switches: They can be used as digital switches in computers and other digital systems.
3. Voltage regulators: They help maintain a stable voltage in power supplies.
4. Motor controls: They are used in the control circuits of electric motors.

Selection Criteria:
When selecting a BJT, consider the following:
1. Current Gain (hFE): The higher the gain, the more current can be controlled with a given input current.
2. Power Rating: Ensure the BJT can handle the power levels required for the application.
3. Operating Voltage: Choose a BJT with a suitable voltage range for the circuit.
4. Frequency Response: For high-frequency applications, select a BJT with a high cutoff frequency.
5. Physical Size and Packaging: Consider the physical dimensions and the type of package that fits the design.
6. Temperature Range: Ensure the BJT can operate within the temperature range of the application.
7. Cost: Factor in the cost-effectiveness of the BJT for the intended use.

BJTs are fundamental to the operation of many electronic devices, and their selection is critical for the performance and reliability of the system.
Please refer to the product rule book for details.
Read More
Bipolar Transistors (BJT)Results:
Comprehensive
Price Priority
Stock Priority
Image
Part Number
Description
Availability
Unit Price(USD)
Quantity
Operation
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenCR,Withstand Voltage50V,Current150mA,HFE:200-400
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0038
9,000+$0.0037
15,000+$0.0036
- +
Ext. Price(USD):$11.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen2X,Withstand Voltage60V,Current600mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenJ6,Withstand Voltage45V,Current100mA,HFE:200-450
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0028
9,000+$0.0028
15,000+$0.0027
- +
Ext. Price(USD):$8.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenG1,Withstand Voltage160V,Current600mA,HFE:100-250
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen1D,Withstand Voltage300V,Current500mA.HFE:100-200
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0105
9,000+$0.0104
15,000+$0.0101
- +
Ext. Price(USD):$31.50
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen4D,Withstand Voltage400V,Current200mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0174
9,000+$0.0171
15,000+$0.0167
- +
Ext. Price(USD):$52.20
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen2TY,Withstand Voltage25V,Current500mA,HFE:200-350
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0031
9,000+$0.003
15,000+$0.0029
- +
Ext. Price(USD):$9.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen5C,Withstand Voltage45V,Current500mA,Current250-600
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0065
9,000+$0.0064
15,000+$0.0062
- +
Ext. Price(USD):$19.50
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen6B,Withstand Voltage45V,Current500mA,HFE:160-400
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0065
9,000+$0.0064
15,000+$0.0062
- +
Ext. Price(USD):$19.50
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreenM6,Withstand Voltage45V,Current100mA,HFE:200-450
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0021
9,000+$0.002
15,000+$0.002
- +
Ext. Price(USD):$6.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen491,Withstand Voltage60V,Current1A,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0138
9,000+$0.0135
15,000+$0.0132
- +
Ext. Price(USD):$41.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen1AM,Withstand Voltage40V,Current200mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0028
9,000+$0.0028
15,000+$0.0027
- +
Ext. Price(USD):$8.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen1P,Withstand Voltage40V,Current600mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen3D,Withstand Voltage400V,Current200mA,HFE:100-200
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0174
9,000+$0.0171
15,000+$0.0167
- +
Ext. Price(USD):$52.20
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen6A,Withstand Voltage45V,Current500mA,HFE:100-250
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0065
9,000+$0.0064
15,000+$0.0062
- +
Ext. Price(USD):$19.50
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenJ3,Withstand Voltage30V,Current500mA,HFE:150-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0028
9,000+$0.0028
15,000+$0.0027
- +
Ext. Price(USD):$8.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen1F,Withstand Voltage60V,Current600mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreenY2,Withstand Voltage25V,Current1.5A,HFE:200-350
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0038
9,000+$0.0037
15,000+$0.0036
- +
Ext. Price(USD):$11.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen2T,Withstand Voltage60V,Current600mA,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenR25,Withstand Voltage12V,Current100mA,HFE:125-250
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0127
9,000+$0.0124
15,000+$0.0121
- +
Ext. Price(USD):$38.10
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreenJ3Y,Withstand Voltage25V,Current500mA,HFE:200-350
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0031
9,000+$0.003
15,000+$0.0029
- +
Ext. Price(USD):$9.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:NPNTube silkscreen6C,Withstand Voltage45V,Current500mA,HFE:250-600
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0065
9,000+$0.0064
15,000+$0.0062
- +
Ext. Price(USD):$19.50
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen591,Withstand Voltage60V,Current1A,HFE:100-300
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0138
9,000+$0.0135
15,000+$0.0132
- +
Ext. Price(USD):$41.40
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen2L,Withstand Voltage150V,Current600mA,HFE:100-250
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0051
9,000+$0.005
15,000+$0.005
- +
Ext. Price(USD):$15.30
MOQ:3,000
Mult:3,000
SPQ:3,000
CHEN RUI KE
Package:SOT-23
ECAD Model:
Triode:PNPTube silkscreen3G,Withstand Voltage45V,Current100mA,HFE:420-800
Available Stock
3,000
Estimated Ship Time:3-5 working days
3,000+$0.0046
9,000+$0.0045
15,000+$0.0044
- +
Ext. Price(USD):$13.80
MOQ:3,000
Mult:3,000
SPQ:3,000
25 / PageGoto